20181010_201047

CHW Network Commissioning of a High Rise Tower

By admin
In October 10, 2018
57 Views

Our consultative solution to our client helps 40% reduced RT capacity then it was initially required, from 1000RT (3516KW) to 600RT (2109KW), we have carefully adjusted the flow and Delta T which helped us to reduce the CHW capacity, this site also has a challenge of tight space means we have to select the equipment with small foot print without compromising the performance and efficiency. We have also suggested to install portable PHEx to safeguard chillers from high back pressure.

Leave A Comment

  • HVAC & POWER SOLUTIONS - F.Z.E.
  • +(971) 50-369-2131
  • +(971) 50-645-7285

Our Mission

To create a quality driven environment that leads to better performance and a sustainable future for our upcoming generations

Our Vision

To become synonym for quality solutions in the field of HVAC & Power.

Newsletter